FLOATING STAIRCASES
in London

six stairs london

Free engineer site visit
and professional measurement

3D design before any works begin
Text WhatsApp WhatsApp
Request a Free Consultation & Cost Estimate
1-2 days
1-2 days
S tar t
FREE MEASUREMENT BY AN ENGINEER
Material selection: solid hardwood, stone, and premium finishes.
Full consultation before the project begins.
5-10 days
5-10 days
Desi gn
3D DESIGN BEFORE PRODUCTION LAUNCH
Detailed technical and schematic project development.
10 days
10 days
Frameㅤ produc tion
CLEAN, PRECISE INSTALLATION WITH NO DEBRIS
Precision-engineered manufacturing and installation of the metal structure
15-20 days
15-20 days
Treads work
STEP CLADDING INSTALLATION
Crafted with oak, natural stone, and carefully selected premium finishes
5-10 days
5-10 days
Final ㅤsta ge
INSTALLATION OF BALUSTRADES
Staircase delivered exactly on time.
Quality proven by 10 years of experience.